Notice!!

Highway Department Office Access 

The Carroll County Highway Garage is undergoing roof replacement this week and into next week 11/06/2026. A crane will be operating in the parking lot during construction.

For everyone’s safety, visitors should call ahead and schedule an appointment before coming to the Highway Department office. Staff will arrange to meet visitors at a safe location away from the building and construction area.

Thank you for your patience and cooperation while this work is completed.



The Highway Department is responsible for constructing and maintaining 125 miles of roads and roadways throughout the county. There are also 24 bridges under county authority.

The department surveys, plans, and supervises the design and construction of all road and bridge projects within the county right-of-way system.  This department is also responsible for the township projects constructed or maintained with Motor Fuel Tax Funds and gives technical assistance to township road commissioners when requested.

Maintenance operations include snow and ice control, traffic line painting, mowing, brush/tree trimming, pavement repairs, drainage installations, and seal coating.  It is part of the duties of the department to inspect, review and determine the appropriateness of driveways, culverts, signs, and other miscellaneous activities that occur within or along the right-of-way of county roadways.

This department also issues permits for oversized vehicles using county highways and to utility companies, municipalities, etc. for the excavation and installation of utilities within the county highway right-of-way.

Township Mileage

Cherry Grove-Shannon Township 72.20
Elkhorn Grove Township 32.44
Fairhaven Township 50.70
Freedom Township 35.04
Mount Carroll Township 45.19
Rock Creek-Lima Township 66.96
Salem Township 33.64
Savanna Township 13.57
Washington Township 19.36
Woodland Township 33.54
Wysox Township 48.43
York Township 53.89